Archive

December 25, 2018

GRASP Engineering reviewed all projects since conception in 2011. Led products installed since then have been working with only the following failures. One tube driver, 1/2 of one 4' tube, 3 Par30's immediate failure due to bad resistor, 6 LED 2x2 at year 4 1/2. driver...

December 25, 2018

All 240 square down lights received and delivered.

December 24, 2018

100 new G9 LED bulbs were supplied to a hotel under renovation. They wanted 2700K and we located and delivered with in a week. Dimmable. They were using 40 W 3000K and their 2 dimmers were overloaded and one had burned out. At a minimul it was a violation and a fire ha...

Please reload

Please reload

Your SINGLE SOURCE PROVIDER for Your LED Lighting Requirements

© 2018 by Grasp Lighting Group, LLC