GRASP LANDS NEW VERY LARGE OFFICE PLAZA
First order placed for LED 2x4 LED ATG Electronics lay in panels. Shipment will be in route 12/26/19. More shipments scheduled every 10 to 14 days until full contract is both ordered and installed. Singer/Vicon Electrical contractor is installing all LED lay in panels and wall packs and 300W area lights. Photo-metrics have been done and will be validated as the 3 main sets of components are installed, Indoor, area lighting followed by wall packs.